37. Bridge Centring

One of the big differences between bridges and buildings has always been the need to build a temporary bridge to carry the permanent one while it is built. These bridges must be fiercely engineered for economy, but they are rarely recorded and leave little in the way of archaeology. Luckily, the engineers were often rightly proud of their centring and there are a number of volumes containing etched images of drawings.

Download this edition as a PDF.